BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Columbus, Ohio. Completed plans call for site work for a water / sewer project.

As of October 11, 2022, project was awarded to Underground Utilities, Inc., awarded amount is $3,733,466.91. the work for which consists of the work for which consists of approximately 9,350 linear feet of 6-inch and 8-inch water mains, and other such work as may be necessary to complete the contract scope, and other such work as may be necessary to complete the contract, in accordance with the drawings, technical specifications, special provisions, and City of Columbus Construction and Material specifications set forth in this Invitation For Bid (IFB) MBE/WBE Contract-specific subcontract goals are required for this service contract. In order to receive credit for the participation of a MBE/WBE subcontractor, the consultant must use MBE/WBEs certified by the City of Columbus Office of Diversity and Inclusion at the time of bid. *** The MBE/WBE Goal for this project is: 8% *** A bidder who fails to submit a bid that meets the MBE/WBE subcontract goals must provide sufficient proof of a good faith effort (GFE). See Appendix C. An MBE or WBE prime bidder may count 100% of the dollar value of the work it intends to perform with its own forces toward the applicable contract participation goal. The cost of supplies and materials obtained by the MBE or WBE for the work of the contract, including equipment leased, may be credited toward the goal (except supplies and equipment the MBE or WBE subcontractor purchases or leases from the prime contractor or its affiliate). The MBE or WBE prime contractor must be certified for the services it intends to self-perform at the time of bid. Bidder/Proposer will receive 60% credit toward goal attainment for use of MBE/WBE suppliers (i.e., where a Bidder/Proposer proposes to purchase $100,000 worth of construction materials from a MBE/WBE Supplier, $60,000 will be credited toward the Bidder/Proposer's MBE/WBE participation goal). However, where the supplier is the manufacturer of the product supplied, Bidders/Proposers will receive MBE/WBE credit for 100% of the dollar amount of the supply contract. The Office of Diversity and Inclusion (ODI) has the sole responsibility for determining what spend is eligible to be counted toward the contract MBE/WBE subcontracting goals and how it will be counted.

Award

Water / Sewer

$3,733,467.00

Public - City

Site Work

41

3

2

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
42
Bidding Soon
1,171
All Active Projects
374
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2022

January 2, 2023

img_map_placeholder

Roswell Dr, Columbus, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.