BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2019 at 7:00 PM

Updated April 21, 2024

Site work and renovation of a water / sewer project in Morris, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

*Contract Award Number: W912EK20C0011 Contract Award Dollar Amount: $16,582,450.00 inclusive of all options Contractor Awarded Name: J.F. Brennan Company, Inc. Contractor Awarded DUNS: 009783523 Contractor Awarded Address: 818 Bainbridge St La Crosse, Wisconsin 54603-1560 United States Base Bid: Upper Bulkhead Recesses includes, but is not limited to, disposal of two emergency miter gate leaves, associated anchorages & pintle balls; removal and disposal of pintle ball bases; concrete removal; fabrication, delivery & installation of precast concrete panels, precast concrete recess panels, steel deadman beams, and steel protection plate assemblies; installation of concrete anchors, check post installation, installation of anchor and wall armor, concrete placement, underwater concrete placement, diving operations, installation of rock dowels and weep holes, and electrical work. Option A: Miscellaneous Mechanical Fabrications includes, but is not limited to, fabrication and delivery of bull gear components, bull gear roller components, structural steel framing and grating. Option B & C: Bull Gear Pit Repairs on the Landwall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; installation of structural steel framing; removal, disposal & installation of grating; and electrical work. Option D & E: Bull Gear Pit Repairs on the I-wall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; removal, cleaning, painting and reinstallation of structural steel framing; removal, disposal & installation of grating; and electrical work. Option F: Upper Guidewall Repairs includes, but is not limited to, horizontal concrete removal and concrete placement; fabrication, delivery & installation of steel reinforcing plate; and electrical work. Estimate Range: $10,000,000.00 to $25,000,000.00 Construciton Days: 350 Consecutive Completion Days Competition: Unrestricted Full & Open It is anticipated that the plans and specifications for this project will be available on ww.fbo.gov on or about 19 July 2019. Any contractor wanting the plans and specifications must download them from this website. MBE : 18.4% WBE : 6.9% Extend the technical inquiries and questions via Bidder Inquiry in ProjNet No Later Than (NLT) August 30, 2019, 2:00 PM Central Time.

Award

Water / Sewer

$16,582,450.00

Public - Federal

Renovation, Site Work

409

79

169

8

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
450
Active Projects
251
Bidding Soon
3,365
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2019

November 11, 2019

Project location map

To Be Determined, Morris, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.