BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2019 at 8:00 PM

Updated September 12, 2025

Site work and paving for a road / highway in Cable, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1. Pulverize one half mile of Pioneer Road this fall. 2. Finish grade and pave same section of Pioneer Road 20 feet wide, two inches thick cold mix asphalt. Paving contractor to provide engineering certificate. Paving to be done in 2020 and complete by July 15, 2020. Bid prices to include Bayfield County prevailing wage rates for public works projects. Please contact Mark Tody, Road Foreman at the Town Garage - 715-763-3111 for specific information about this project. The Town Board of the Town of Grand View reserves the right to reject any or all bids.

Award

Roads / Highways

$42,831.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
22
Bidding Soon
223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2019

August 9, 2019

Project location map

Pioneer Rd, Cable, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.