BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2019 at 8:00 PM

Updated December 31, 2025

Site work, paving and new construction of a civil project in Gautier, Mississippi. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and road / highway.

As of September 17, 2019 the project has been awarded F & F Construction, Inc., for a total bid award of $521,471.50. For Martin Bluff Road Bridge and Road Realignment Project When submitting an electronic bid, the bid must be submitted in "pdf" format and shall contain the same information and forms as required for the paper bids. Electronic bids must be secured with a bid bond. When submitting a bid electronically, the authorized signature may be a hand-written blue ink signature or be an electronic signature. When bids are submitted electronically, the requirement for including a certificate of responsibility, or a statement that the bid enclosed does not exceed Fifty Thousand Dollars ($50,000.00), on the exterior of the bid envelope shall be deemed in compliance by including the same information as an attachment with the electronic bid submittal. When submitting an electronic bid, the bid must be submitted in "pdf" format and shall contain the same information and forms as required for the paper bids. Electronic bids must be secured with a bid bond. When submitting a bid electronically, the authorized signature may be a hand-written blue ink signature or be an electronic signature. When bids are submitted electronically, the requirement for including a certificate of responsibility, or a statement that the bid enclosed does not exceed Fifty Thousand Dollars ($50,000.00), on the exterior of the bid envelope shall be deemed in compliance by including the same information as an attachment with the electronic bid submittal. The County reserves the right to reject any or all bids not conforming to the intent and purpose of the specifications, and to postpone the award of the Contract for a period of time which, however, shall not extend beyond 90 days from the bid opening date.

Award

Bridges / Tunnels

$521,471.00

Public - County

New Construction, Paving, Site Work

3

1

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
3
Bidding Soon
388
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2019

September 4, 2019

Project location map

Martin Bluff Rd, Gautier, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.