BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Spirit Lake, Iowa. Completed plans call for site work for a educational facility.

School Board of the Spirit Lake Community School District, in Dickinson County, Iowa, will meet on Monday, July 15, 2019, at 5:30 P.M., at which time and place a hearing will be held in the board room located at 2701 Hill Ave., Spirit Lake, IA 51360 on the proposed plans and specifications, form of contract and estimate of cost for the 2019 Spirit Lake Community School District Tennis Court Improvements Project for said school district Alternate #1 generally consists of approximately: 652 CY of Topsoil, On-Site; 2,785 CY of Excavation, Class 10, Borrow; 3,091 SY of 6" Modified Subbase; 619 LF of 6" HDPE Subdrain; 1 Each Subdrain Outlets and Connections; 2,972 SY of 2.5" HMA Base Course Pavement; 2,972 SY of 1.5" HMA Surface Course Pavement; 1 LS HMA Pavement Samples and Testing; 4,600 SY of Pavement Removal; 1 LS of Temporary Traffic Control; 1.4 Acres of Conventional Seeding, Seeding, Fertilizing and Hydro-Mulching; 1 LS Storm Water Pollution Prevention Plan, Management; 420 LF of Silt Fence Installation and Removal; 110 SY of Stabilized Construction Entrance; 1 Each Inlet Protection Device, Installation and Maintenance; 785 LF of Black Coated PVC Chain Link Fence; 1,482 LF of Fence Removal; 1 LS Mobilization; 2,972 SY of Tennis Court Surfacing; 4 EA Tennis Nets and Posts and other related items of work. Alternate #2 generally consists of approximately: 662 CY of Topsoil, On-Site; 2,798 CY of Excavation, Class 10, Borrow; 197 SY of 4" Modified Subbase; 2,933 SY of 6" Modified Subbase; 621 LF of 6" HDPE Subdrain; 1 Each Subdrain Outlets and Connections; 118 S.Y. of 6" PCC Pavement; 2,933 SY of 2.5" HMA Base Course Pavement; 2,933 SY of 1.5" HMA Surface Course Pavement; 1 LS HMA Pavement Samples and Testing; 4,600 SY of Pavement Removal; 1 LS of Temporary Traffic Control; 1.4 Acres of Conventional Seeding, Seeding, Fertilizing and HydroMulching; 1 LS Storm Water Pollution Prevention Plan, Management; 420 LF of Silt Fence Installation and Removal; 110 SY of Stabilized Construction Entrance; 1 Each Inlet Protection Device, Installation and Maintenance; 792 LF of Black Coated PVC Chain Link Fence; 1,482 LF of Fence Removal; 1 LS Mobilization; 2,933 SY of Tennis Court Surfacing; 4 EA Tennis Nets and Posts and other related items of work. All proposals shall be made on official proposal forms furnished by the Engineer and shall contain worded and figured prices for the work bid on. All proposals shall be plainly legible, sealed, and addressed to the Spirit Lake Community School District, Attn: Dr. David Smith, Superintendent, 2701 Hill Avenue, Spirit Lake, IA 51360. Bidder shall submit a Bidder Status Form with their bid. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed unresponsive and rejected. A certified check or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid shall be included in a separate sealed envelope, plainly marked "bid bond". The bid guarantee shall be forfeited as liquidated damages if the successful bidder fails proper execution. The checks or bid bonds of the lowest two or more bidders may be held for the earlier of 7 days after the effective date of the agreement or 61 days after the bid opening, whereupon Bid Security furnished by such bidders will be returned. Other checks or bid bonds will be returned after the tabulation of bids is completed. The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor No submitted bids may be withdrawn for a period of thirty (30) days from the scheduled closing time for the receipt of bids. Deposit will be returned if plans and project manual are returned in good condition within 14 days after public hearing date. The Contractor will be paid monthly in an amount equal to ninety-five percent (95%) of the Work completed during the previous month according to the Engineer's estimate. The final payment will be made not less than thirty (30) days after completion of the Work and acceptance by the School. No final payment will be due until the Contractor has certified that the materials, labor, and services have been paid for in accordance with the Project Manual. The right to accept or reject any or all bids and to waive informalities is reserved Final Completion: All work shall be completed by October 25, 2019. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor to the extent lawfully required under Iowa statutes, providing that the award of the contract will be made to the lowest responsible bidder submitting the lowest acceptable bid, which shall be given without regard to state or local law whereby preference is given on factors other than the amount of the bid

Award

Playgrounds / Parks / Athletic Fields

$313,808.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
25
Bidding Soon
394
All Active Projects
136
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 12, 2019

August 12, 2019

October 25, 2019

img_map_placeholder

2701 Hill Ave, Spirit Lake, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.