BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2019 at 8:00 PM

Updated October 22, 2025

Site work and renovation of a water / sewer project in Dunedin, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work generally consists of the following: The removal, disposal, and replacement of all aerators, distributors and associated piping, valves and flow meters of four (4) aeration basins, cleaning, repair, and coating of piping, structures and surfaces as indicated in the drawings and specifications for the current aeration basins. This includes mechanical, concrete and masonry work, painting, piping, etc. The project is located at The City of Dunedin Wastewater Treatment Plant (1140 Martin Luther King Jr. Avenue Dunedin, Florida 34698). The time allotted for this project is 270 days, for substantial completion and 30 additional days for final completion. All contractor Requests For Information (RFI) must be submitted ten (10) days before the bid opening, to Russell Ferlita, Ph.D., P.E., Section Engineer, at rferlita@dunedinfl.net, prior to 2:00 p.m., local time. The City will not respond to RFIs submitted after that date. The City will process the requests and respond within a timely manner. All work performed shall be in accordance with the Contract Documents. Proposals must be marked with the bidders name and address and be accepted by the Purchasing Office. Contact Chuck Ankney, CPPO, Purchasing Agent, at cankney@dunedinfl.net, if interested. It is the bidders responsibility to check the final documents and addendum prior to bid submittal. No proposal may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days without the consent of the City. Any bid received after the time and date specified shall not be considered. The City of Dunedin, Florida reserves the right to reject any and all bids received, to waive any irregularities or informalities, to re-advertise and to award the Contract in its best interest. Bids which are incomplete or which are not submitted in accordance with instructions in the Invitation may be disqualified.

Award

Water / Sewer

$745,943.00

Public - City

Renovation, Site Work

32

1

2

7

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
100
Bidding Soon
1,772
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2019

August 29, 2019

Project location map

1140 Martin Luther King Jr Ave, Dunedin, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.