BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a mixed-use development in Fresno, California. Completed plans call for site work for a transportation facility; and for the construction of a 318,000-square-foot, four-story above grade, 920-space parking garage.

*Please contact the awarded design/builder for access to the bid results. This project at the Fresno-Yosemite International Airport is for a 4-story, new construction, cast-in-place parking structure of approximately 318,000 gross SF and will provide 920 stalls. The Automated Parking Guidance System is intended to facilitate a more efficient flow of traffic and provide stall availability/counts. Please note that there is no solar canopy currently in scope, but may be added in the future. Only camera-based, single-space APGS solutions with LPR capability will be considered. The delivery model for the APGS system will be Design-Build by the vendor. Owner requires an APGS installation method in which all required conduit, junction boxes, and wiring required to interconnect all APGS equipment are pre-embedded in the cast-in-place concrete structure. Owner does not want exposed UnistrutTM or similar custom track systems to be used. As such, proposers are required on a mandatory basis to identify and describe in their proposal a compliant approach for such installation, including a conduit layout plan and the associated installation prices assuming this method of construction. The winning bidder will also be required to promptly coordinate with the construction team immediately upon award and produce appropriate Construction Drawings and other Submittals regarding type and placement of all pre-embedded pathways. Time will be of the essence in providing the aforementioned Construction Drawings and other related Submittals in order to not delay the pouring of the concrete decks. There is a Project Labor Agreement in effect and the selected bidder will need to be compliant. The APGS system installation is expected to commence in the 3rd quarter of 2021.

Award

Parking Garage

$35,000,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
388
All Active Projects
169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2020

July 1, 2021

img_map_placeholder

5175 E Clinton Way, Fresno, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.