BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated June 28, 2024

Site work for a water / sewer project in Fresno, California. Completed plans call for site work for a water / sewer project.

The Fresno Metropolitan Flood Control District, however, reserves the right to reject any or all bids, or to waive any or all bids, or to waive any informality in a bid No contract will be awarded to a Contractor who is not registered with DIR, has not been licensed in accordance with the provisions of the Contractors State License Law, California Business and Professions Code, Division 3, Chapter 9, as amended, and whose bid is not on the proposal form included in the contract document. A valid California Contractor license, Class A, (General Engineering) is required for this project. As provided for in Section 7-7 of the Standard Specifications, Contractor and all subcontractors shall be solely responsible for complying with all statutes and regulations governing the payment of prevailing wages, including, without limitation, Labor Code Sections 1725.5, 1771, 1774 and 1775, as amended. Construction of Storm Drainage Facilities in Drainage Area BS Cash, a cashier's check, certified check or bidder's bond, in the amount of not less than ten percent (10%) of the amount of the bid, shall accompany each proposal, made payable to the order of the Fresno Metropolitan Flood Control District, as a guarantee that the bidder will, after being notified of the acceptance of his bid, make a contract with the Fresno Metropolitan Flood Control District in accordance therewith, and will furnish the required contractor's bonds. The bonds required of the successful bidder are a faithful performance bond in the amount of one hundred ten percent (110%) of said bid and a payment bond in an amount equal to one hundred percent (100%) of the amount of said bid, in accordance with the provisions of Sections 3247-3251 of the California Civil Code. The Contractor shall begin on-site construction within ten (10) calendar days of issuance of the Notice to Proceed and shall diligently prosecute the total work involved to completion before the expiration of sixty (60) calendar days from the starting date specified in the Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$1,414,005.00

Public - City

Site Work

7

3

9

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
1
Bidding Soon
376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

August 19, 2024

Project location map

Multiple Locations, Fresno, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.