BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2019 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a mixed-use development in Dunedin, Florida. Completed plans call for the construction of a 14,959-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The work generally consists of all labor, materials, tools, accessories and adjunct services for the erection of a new pre-engineered metal building structure and the construction of all designed improvements necessary to house the Dunedin Golf Clubs 13,223 s.f. Cart Barn and 1,736 s.f. air-conditioned Pro Shop space that is connected to the Cart Barn. Total gross square footage of the new single-story building is 14,959 s.f. The designed improvements to the already purchased pre-engineered metal building include foundation, electrical, mechanical, plumbing, and fire sprinkler protection along with the interior build-out and storefront improvements as identified in the Construction Documents. All site work outside the foot print of the building including grading, drainage, landscape, irrigation and paving will be performed by the Owner. The budgeted amount for the project is $320,000.00. The time allotted for this project is 90 days, for substantial completion. All contractor Requests For Information (RFI) must be submitted ten (10) calendar days before the bid opening, to Chuck Ankney, Purchasing Agent, at cankney@dunedinfl.net prior to 2:00 p.m., local time. The City will not respond to RFI's submitted after that date. The City will process the requests and respond within a timely manner. All work performed shall be in accordance with the Contract Documents. Two copies of the bid proposal shall be submitted on the standard forms that are included in the specifications and must be marked, "Sealed Bid for Contract Erection of and Improvements to a City Furnished Pre-Engineered Metal Building Financial Project : 421802 Bid : 19-1142 In addition, the proposals must be marked with the bidders name and address and be accepted by the Purchasing Office by the time and date specified above. Proposals must be accompanied by a certified check or a cashiers check or an acceptable bid bond in an amount not less than five percent (5%) of the total bid. No proposal may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days without the consent of the City. Any bid received after the time and date specified shall not be considered. The City of Dunedin, Florida reserves the right to reject any and all bids received, to waive any irregularities or informalities, to re-advertise and to award the Contract in its best interest. Bids which are incomplete or which are not submitted in accordance with instructions in the INVITATION may be disqualified.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$398,135.00

Public - City

New Construction, Site Work

71

23

3

2

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
105
Bidding Soon
1,768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2019

October 17, 2019

Project location map

1050 Palm Blvd, Dunedin, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.