BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2019 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in El Reno, Oklahoma. Completed plans call for site work for a water / sewer project.

Project includes replacement of approximately 300 LF of 18" Gravity Sewer, with 18" PolyPipe constructed by directional boring. The project consists of: Minor pavement removal and replacement, 300 LF of polypipe directional boring, construction of four manholes and other Miscellaneous Appurtenances. Each proposal shall be accompanied by an acceptable form of Proposal Guaranty in an amount equal to at least fi ve percent (5%) of the amount of Proposal, as guaranty that if the Proposal is accepted, the Bidder will execute the Contract and furnish the acceptable Performance Bond, Statutory Bond, Maintenance Bond, Owner's Protective Liability Policy, Defect Bond and Certifi cates of Insurance within fi fteen (15) days after the award of the contract. The time allowed for completion of this project is 21 working days. Liquidated damages for failure to complete the project within the allotted time or authorized extensions thereof shall be $350.00 per working day. The Owner reserves the right to reject any or all bids, to waive any informality in the bidding, for the benefi t of the Owner. Maintenance Bond equal to twenty-five percent (25%) for the first year, and ten percent (10%) for the second and third year.

Award

Water / Sewer

$162,700.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
41
Bidding Soon
736
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2019

September 5, 2019

Project location map

E Foreman Dr & N Foster Ave, El Reno, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.