BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, renovation and addition to an educational facility in Brossard, Quebec. Completed plans call for the addition of a 35,750-square-foot, two-story above grade, 16-room, 350-seat educational facility; for site work for a educational facility; and for the renovation of a educational facility.

Reference number : 1443708 Deadline for receipt of complaints: 2021-03-01 Electronic submission accepted: Yes, in a single submission document Expected duration of the contract (in months): 19 The Marie-Victorin School Services Center, owner, is requesting bids for the Expansion work at Marie-Victorin Elementary School (Brossard) . Bids must be accompanied by a bid security, which must correspond to ten percent (10%) of the amount of the bid, in the form of a certified check, draft, irrevocable letter of guarantee or a bond. The bid bond must be issued by a Financial Institution that is an insurer holding a license issued in accordance with the Act respecting insurance (RSQ, cA-32) authorizing it to practice bond insurance, a trust company holding a a permit issued under the Act respecting trust companies and savings companies (RSQ, c. S-29.01), a financial services cooperative referred to in the Act respecting financial services cooperatives(RSQ, c. C-67.3) or a bank within the meaning of the Bank Act (LC, 1991, c.46). When the tender guarantee is in the form of a surety bond, it must be accompanied by a letter of commitment issued by the bond issuer stipulating that a performance bond and a surety bond for pledges, materials and services will be awarded to the successful tenderer. When guarantees are in the form of a surety bond, the amount of each of them corresponds to fifty percent (50%) of the contract price. When the guarantee is in the form of a certified check or a draft, the tender guarantee must be issued in favor of the School Service Center. This tender guarantee may be exchanged no later than fifteen (15) days after the sending of the tender letter for a performance bond and a bond for the obligations for pledges, materials and services, the amount of each of them. corresponds to fifty percent (50%) of the contract price. The Marie-Victorin School Services Center does not undertake to accept any of the submissions received. Beginning of the roadworks May 17, 2021 Provisional acceptance of the expansion August 19, 2022 End of the works December 17, 2022

Award

Educational

$20,677,717.00

Public - State/Provincial

Addition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
110
Bidding Soon
1,743
All Active Projects
651
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2021

June 11, 2021

img_map_placeholder

800 Avenue Victor-Hugo, Brossard, QC


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.