BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2019 at 8:00 PM

Updated November 15, 2023

Renovation of a water / sewer project in Milwaukee, Wisconsin. Completed plans call for the renovation of a water / sewer project.

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. NOTICE: All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA portal. DFD Contractor Certification page: electronically or upon request from DFD-email dfdcertification@wisconsin.gov In general the work consists of: Removing (2) existing 100 HP air compressors (#1 and #2) in the Lower Level of the Central Heating Plant, and replacement of these (2) air compressors with (1) new 150 HP air cooled air compressor with condenser water cooled oil cooler and aftercooler. A new equivalent capacity air dryer is also being provided to pair up with the new air compressor. The project also includes installation of a new owner furnished contractor installed chlorine dioxide (CI02) chilled water treatment system. Additional project construction bidding information, including plan holders list, is available on the DFD portal. Please note that a WisBuild login and password are required to download bidding documents. Interested parties may request a WisBuild login and password at the DFD portal - allow 2 days to process login and password requests. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Bid Results

Water / Sewer

$237,700.00

Public - State/Provincial

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
112
Bidding Soon
1,976
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2019

October 21, 2019

Project location map

To Be Determined, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.