EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 19, 2019 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Georgetown, Georgia. Completed plans call for site work for a water / sewer project.

The Project consists of a back-up power supply generator installation, by-pass pumping connection, replacement of +/- 7 air relief valves, adding +/- 770 LF of 8" PVC water main along with +/- 640 linear feet of 6" Fusible PVC water main including fittings, valves, fire hydrants and services and other items indicated in these Contract Documents. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with alternate bid items as indicated in the Bid Form. Upon Issuing Office's receipt of payment, Bidding Documents will be sent via email or other means of electronic file distribution. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bid security shall be furnished in accordance with the Instructions to Bidders. All permits required for the construction of this project are expected to be approved prior to the date of full contract execution and notice to proceed (pending the approval of applicable GDOT utility permits). Acquisition of property for permanent easements and/or right of way is not expected to be required for this project. This project is expected to be funded all or in part by the Georgia Environmental Finance Authority's (GEFA) Drinking Water State Revolving Fund loan. The construction contract will be subject to GEFA's Supplemental General Conditions for Federally Assisted State Revolving Loan Fund Construction Contracts including Disadvantaged Business Enterprise requirements and Davis Bacon & Related Act requirements. Additionally, the contract will be subject to GEFA's American Iron and Steel Special Conditions and Information for Federally Assisted State Revolving Loan Fund Construction Contracts. Bid date will be extended upon the release on a second addendum.

Award

Water / Sewer

$187,000.00

Public - County

Site Work

12

1

4

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
31
Bidding Soon
286
All Active Projects
154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2019

December 30, 2019

img_map_placeholder

Multiple Locations, Georgetown, GA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.