Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Site work and new construction of a water / sewer project in Andover, Massachusetts. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
UPDATE: WTP – Filter Backwash Tank Project is in Town of Andover capital budget fy 2026-2030 CIP _____________________________________________________________ UPDATE:https://andoverma.gov/DocumentCenter/View/13676/Town-Managers-Recommended-Capital-Improvement-Program-FY2025---FY2029 This project would involve the construction of a new tank and wetwell for the purpose of storing filtered backwash water. Project is in Town of Andover capital budget fy 2025 - 2029 CIP page 123 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Design, engineering, permitting and construction management for a new Filter Backwash Discharge Storage/Equalization Tank to hold filter backwash water until it can be bled back into the treatment train at the raw water intake. As of September 16, 2021 no new CIP issued, this project is currently in the FY 2021-2025 CIP . Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$5,750,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2030
To Be Determined, Andover, MA
Related To This Project
Andover, MA
Bid Date: Mar 12 2026
Andover, MA
Bid Date: Aug 21 2025
Andover, MA
Bid Date: Apr 07 2021
Andover, MA
Bid Date: Mar 22 2021
Andover, MA
Bid Date: Sep 11 2025
Andover, MA
Bid Date: Sep 19 2025
Andover, MA
Bid Date: Sep 18 2025
Andover, MA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
