Site work for a water / sewer project in Andover, Massachusetts. Conceptual plans call for site work for a water / sewer project.

UPDATE : This project would include the replacement of two (2) raw water travelling screens in kind. Further, a modern control center would be installed, allowing for scheduled operation via SCADA at a time when operation would be less likely to impact overall treatment capacity. This approach is similar to the scheduled operation of the individual flights and chains in the sedimentation basins. This project would also include the replacement of two (2) of the four (4) motors and all four (4) pumps, including check valves, and isolation valves. This request consolidates two former requests (DPW-36-25 and DPW-41-25) in order to achieve economies of scale, due in part to the fact that both projects include equipment in the same location and of the same vintage. Savings are expected as a result of a single mobilization to the site, project sequencing, and maintenance of plant operation (MOPO) considerations. Project is in Town of Andover capital budget fy 2026-2030 CIP ________________________________________________________________________________ This project would include the replacement of two (2) of the four (4) motors and all four (4) pumps, including check valves, and isolation valves. As of August 13, 2024, this project is included in the city's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,850,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
546
Active Projects
247
Bidding Soon
3,850
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

To Be Determined, Andover, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.