BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2019 at 8:00 PM

Updated November 15, 2023

Site work for a civil project in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

The removal of the existing two culverts and installation of two new culverts on Gold Bar Creek along with associated road construction will comprise the following work: 1.Removal of the existing two 1500mm diameter CSP culverts over Gold Bar Creek. 2. Installation of two new 1500mm diameter CSP culverts. 3. Road Construction to restore the existing roadway. Award is subject to final approval.

Award

Bridges / Tunnels

$295,295.00

Public - County

Site Work

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
1
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2019

October 1, 2019

Project location map

84 Ave, Edmonton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.