Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 27, 2019 at 7:00 PM
Updated November 15, 2023
Renovation of a municipal facility in Milwaukee, Wisconsin. Completed plans call for the renovation of a municipal facility.
As of Oct 30, 2019 project has not yet been awarded and no specific date for award. Effective January 1,2014, all potential bidders must be certified by DOA prior to submitting 19 bids on state construction projects over $50,000 All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions ofwork first. Within 5 days ofthe MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division ofwork. These successful MEP bids must be included in all general prime contractor bids received.,No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists ofthe installation of a fire sprinkler system on Ground Floor and Floors 1-5 ofthe Tommy G. Thompson Youth Center building. Based on flow test data, a new electric motor-driven fire pump will be provided to boost the available water supply pressure to meet minimum system demands. A new, dedicated electric service is required to be provided to power the new pump per NFPA 20 and 70 standards. An existing space in the building will be required to be modified to house this fire pump. The existing manual dry standpipe system will be reused, being modified to function as a Class I manual wet standpipe system, with the center stair transitioning to a combined standpipe used to supply both hose connections and sprinkler systems on each floor ofthis building. Sprinkler systems will be designed per the NFPA 13 standard as adopted under Chapter SPS 314, Fire Prevention. The basement level includes a sprinkler system to remain as existing. The structure on the roofwill have the exposed wood sheathing receive a fire proofing spray. Bidder shall identify the division ofwork they are bidding on when requesting Bidding Documents online. Base Bids will be received as a single lump sum bid for: 2) Fire Protection (Fire Suppression); 4)Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% ofthe Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23,2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23,2017. This change does not affect the Federal Davis Bacon Act requirements. Bidding Documents will be available electronically immediately upon the project being advertised for bid The project value listed reflects the total project estimate. Bid Results FIRE PROTECTION - Fireline Sprinkler, LLC - $158,345.00 PLUMBING - CornerStone One, LLC - $394,460.00 HVAC - J & H Heating Inc - $1,348,000.00 ELECTRICAL - WIL-Surge Electric Inc - $1,918,410.00
Award
Municipal
$9,777,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2019
December 30, 2019
1001 W St Paul Ave, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Mar 26 2019
Milwaukee, WI
Bid Date: Jan 17 2019
Milwaukee, WI
Bid Date: Mar 12 2019
Milwaukee, WI
Bid Date: Feb 11 2022
Milwaukee, WI
Bid Date: Feb 11 2022
Milwaukee, WI
Bid Date: Feb 11 2022
Milwaukee, WI
Bid Date: Feb 10 2022
Milwaukee, WI
Bid Date: Nov 21 2019
Milwaukee, WI
Bid Date: Mar 11 2020
Milwaukee, WI
Bid Date: Mar 12 2020
Milwaukee, WI
Bid Date: Apr 28 2020
Milwaukee, WI
Bid Date: Aug 04 2020
Milwaukee, WI
Bid Date: Aug 11 2020
Milwaukee, WI
Bid Date: Feb 16 2021
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
