BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Milwaukee, Wisconsin. Completed plans call for the renovation of a municipal facility.

As of Oct 30, 2019 project has not yet been awarded and no specific date for award. Effective January 1,2014, all potential bidders must be certified by DOA prior to submitting 19 bids on state construction projects over $50,000 All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions ofwork first. Within 5 days ofthe MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division ofwork. These successful MEP bids must be included in all general prime contractor bids received.,No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists ofthe installation of a fire sprinkler system on Ground Floor and Floors 1-5 ofthe Tommy G. Thompson Youth Center building. Based on flow test data, a new electric motor-driven fire pump will be provided to boost the available water supply pressure to meet minimum system demands. A new, dedicated electric service is required to be provided to power the new pump per NFPA 20 and 70 standards. An existing space in the building will be required to be modified to house this fire pump. The existing manual dry standpipe system will be reused, being modified to function as a Class I manual wet standpipe system, with the center stair transitioning to a combined standpipe used to supply both hose connections and sprinkler systems on each floor ofthis building. Sprinkler systems will be designed per the NFPA 13 standard as adopted under Chapter SPS 314, Fire Prevention. The basement level includes a sprinkler system to remain as existing. The structure on the roofwill have the exposed wood sheathing receive a fire proofing spray. Bidder shall identify the division ofwork they are bidding on when requesting Bidding Documents online. Base Bids will be received as a single lump sum bid for: 2) Fire Protection (Fire Suppression); 4)Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% ofthe Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23,2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23,2017. This change does not affect the Federal Davis Bacon Act requirements. Bidding Documents will be available electronically immediately upon the project being advertised for bid The project value listed reflects the total project estimate. Bid Results FIRE PROTECTION - Fireline Sprinkler, LLC - $158,345.00 PLUMBING - CornerStone One, LLC - $394,460.00 HVAC - J & H Heating Inc - $1,348,000.00 ELECTRICAL - WIL-Surge Electric Inc - $1,918,410.00

Award

Municipal

$9,777,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
68
Bidding Soon
1,143
All Active Projects
455
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2019

December 30, 2019

img_map_placeholder

1001 W St Paul Ave, Milwaukee, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.