BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Pompano Beach, Florida. Working plans call for paving for a bridge / tunnel; road / highway; sidewalk / parking lot; for site work for a water / sewer project; and for outdoor lighting for a road / highway.

As of May 7 2024 this project is in the permitting stage. An engineer has been selected for the project. Although a firm timeline for construction has not been determined. The following is for historical purposes: Pursuant to Florida Statutes Chapter 287.055 "Consultants' Competitive Negotiation Act" the City of Pompano Beach invites professional firms to submit qualifications and experience for consideration to provide professional design, consulting, engineering, services Southeast 6th Terrace Bridge Replacement. The City of Pompano Beach Engineering Department (CITY) has identified major projects and programs within the CITY boundaries with the goal to make the City more attractive to residents, visitors and tourists and promote economic growth and activity as detailed in the City's Strategic Plan. Question Cutoff Date: 10/22/2019 05:00:00 PM (ET) The proposed improvements include, but are not restricted to, demolition of existing structure/s; realignment of bridge approach; maximizing allowable heights under the bridge; installation/upgrade/replacement/relocation of utilities (drainage, water, sewer and irrigation) in line with the configuration of the new bridge, as necessary; new decorative lighting on or near the bridge; defining Architectural decorative features pertinent to the community and City standards; American with Disabilities Act (ADA)-compliant walkways on either side of the bridge with pedestrian lighting; pavement (driveways/access roads); landscaping (trees, palms, groundcovers, etc.); full structural, architectural, landscape, design and construction administration services for a new bridge approximately +/-100 ' in length and +/-40 ' in width ; and, other improvements outlined in the final construction plans. The proposed improvements may not occur at the same time, and the City may wish to phase construction efforts as necessary. The method of contractor selection has not been determined at this time.

Final Planning

Bridges / Tunnels

$2,900,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
51
Bidding Soon
1,134
All Active Projects
513
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

img_map_placeholder

SE 6th St, Pompano Beach, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.