Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 9, 2025 at 7:00 PM
Updated January 10, 2025
Site work and paving for a bridge / tunnel in Pompano Beach, Florida. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
UPDATE :https://cdn.pompanobeachfl.gov/city/pages/budget/FY-2025-Adopted-Operating-Budget.pdf Painting the Hillsboro bridge to match the current city color scheme and incorporating marine life graphics on the façade is similar to painting the Atlantic Boulevard bridge. Project is in City of Pompano Beach capital budget fy 2025 CIP 377 _________________________________________________________________________________________ Update : https://cdn.pompanobeachfl.gov/city/pages/budget/Adopted-Operating-Budget-FY24.pdf Painting the Hillsboro bridge that Matches the current city color scheme, as well as Incorporating marine life graphics on the façade, Similar to the Atlantic boulevard bridge Project is included City of Pompano Beach FY 2024-2028 Page No 435 --------------------------------------------------------------------------------------------------------------------------------- This project includes repainting the bridge with a color that's more in tune with our City's theme and incorporating the marine-like graphics on the facade as we did on the Atlantic Boulevard bridge. As November 04, 2022, this project is currently in the FY 2023 Adopted Budget. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$1,356,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2028
To Be Determined, Pompano Beach, FL
Related To This Project
Pompano Beach, FL
--
Pompano Beach, FL
--
Pompano Beach, FL
Bid Date: Jan 16 2025
Pompano Beach, FL
--
Pompano Beach, FL
--
Pompano Beach, FL
--
Pompano Beach, FL
Bid Date: Dec 12 2022
Pompano Beach, FL
Bid Date: Sep 12 2022
Pompano Beach, FL
--
Pompano Beach, FL
--
Pompano Beach, FL
Bid Date: Oct 29 2025
Pompano Beach, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
