Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 31, 2024 at 8:00 PM
Updated November 1, 2024
Demolition, site work, paving, asbestos abatement and outdoor lighting for a mixed-use development in Lees Summit, Missouri. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for the demolition of a multi-residential development; multi-residential development; for asbestos abatement for a multi-residential development; and water / sewer project.
The proposed work includes: Constructing approximately 2.5 miles of Pryor Road as a 4-lane divided roadway from Hook Road to approximately Longview Road. Project also includes construction of sidewalk, shared use path, street lighting, and traffic signal installation at Hook Road, Scherer Road, and Eagle View Drive intersections. The work also includes installation of water line, curb and gutter, residential building demolition with hazardous material abatement, and storm sewer. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Lees Summit, Missouri reserves the right to reject any or all bids. The DBE Goal for this project is 8% and On-the-job trainee hours will be 4000 hours. MODOT - Pryor Road Improvements MoDOT STBG-3371(403 Questions must be received by 5:00 p.m. on Wednesday, October 23, 2024. Questions are to be addressed to Nikia Chapman-Freiberger at Nikia.CFreiberger@cityofls.net.
Bid Results
Roads / Highways
$24,988,855.00
Public - City
Asbestos Abatement, Demolition, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2024
December 30, 2024
SW Pryor Rd, Lees Summit, MO
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
