BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a civil project in Colleyville, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of 12/06/2019 The Council approved the award of this contract to Garrett Demolition, Inc. for a cost of $148,232.30. As of 12/03/2019 The start date may vary; however, the anticipated Notice to Proceed date is January 6, 2020. These items shall include the following - o Removal of the 1.2 Million Gallon Water GST (Welded Steel/Coated) o Removal of concrete ring wall foundation to full depth o Removal of tank foundation granular material to elevation 712.00' o Removal of one-story cinder block buildings (3 each) o Removal of yard piping (including valves, meter boxes, fittings and blocking) 1. This section specifies the labor, materials, equipment, and incidentals required for the demolition, relocation, and/or disposal of all structures, building materials, equipment, and accessories to be removed as shown on the construction plans and as specified herein. 2. There may be existing and active storm water, wastewater, water, and other facilities on site as indicated on the construction plans. It is essential that these facilities, when encountered, remain intact and in service during the proposed demolition. 3. The Contractor shall examine the various drawings, visit the site, determine the extent of work, the extent of work affected therein, and all conditions under which he/her is required to perform the various operations. 4. Demolition Includes: 1) Complete demolition and removal of above and below ground structures, concrete slabs, foundations, vaults, and underground utilities (water, wastewater, electrical, etc.) as shown on the construction plans. 2) All material, equipment, rubble, debris, and other products of the demolition shall become the property of the Contractor for his/her disposal off-site in accordance with all applicable laws and ordinances at the Contractor's expense. The sale of salvageable materials by the Contractor shall only be conducted off-site. The sale of removed items on the site is prohibited by the City. 3) Complete demolition and removal of manholes, valve vaults, wet wells, piping, meter boxes, fittings, blocking, and mechanical and electrical equipment related to the Work as shown on the construction plans. 5. The Contractor shall fill and compact all voids left by the removal of pipe, structures etc. with materials described herein to a grade that will provide for positive drainage of the disturbed area to drain run-off in direction consistent with the surrounding area. The intent is to grade to the contrours shown on the plans, maintain the existing drainage pattern and to avoid the import of borrow material. Compaction of fill shall match the compaction of adjacent undisturbed material. Bidders should submit all inquiries and/or questions concerning this project to the person identified below by Friday, November 8, 2019 at 5:00 P.M. Questions that result in changes to the specifications will be answered in writing and copies distributed to bidders of record in the form of an adden

Award

Water / Sewer

$148,232.00

Public - City

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
64
Bidding Soon
3,518
All Active Projects
1,398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.