Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 1, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a municipal facility in Orangeburg, South Carolina. Completed plans call for the renovation of a 2,800-square-foot, one-story above grade municipal facility.

Orangeburg Administrative Building 2nd Floor Renovations Approximately 2,800 square feet of existing office space. Renovations include but are not limited to: interior demolition and disposal of carpet, wall base, gypsum board, metal stud wall framing, and acoustical ceiling tile. New construction shall include but is not limited to: carpet tile, rubber base, steel stud wall framing, gypsum board, wood doors, hollow metal frames, painting, acoustical ceiling tile, hvac ductwork, supply and return diffusers, electrical lighting, communications and power systems

Award

Municipal

$100,000.00

Public - County

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
83
Bidding Soon
1,140
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2019

December 16, 2019

Project location map

1437 Amelia St, Orangeburg, SC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed