BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Orangeburg, South Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and municipal facility.

Inspect DPU Operations Center parking area and retention pond area specified in attached plan. Following all applicable laws and regulations, saw cut existing asphalt, excavate as needed and install approximately 600' of new spill curb to match existing grade. Backfill new curb and retention pond with topsoil and overseed with Bermuda grass when complete. Contractor responsible for all cleanup and debris removal. Draft contract available upon request. All DPU vendor terms and conditions apply. Background: Operations center parking area and retention pond installed during the last 2 years. New curbing requested around retention pond for traffic control. 1. Rig and set all safety and project equipment. 2. Furnish and install new spill curb per attached civil engineering plans. 3. Install control joints as required by plans. 4. Concrete type must be 3000 psi and control joints at 10' intervals 5. Proper clean up and final inspection to be completed by owner and owner's engineer 6. General Warranty on workmanship for 1 year.

Post-Bid

Municipal

$110,000.00

Public - City

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
69
Bidding Soon
1,046
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2022

May 16, 2022

Project location map

350 Sprinkle Ave, Orangeburg, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.