Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in El Cajon, California. Completed plans call for the renovation of a educational facility.
As of June 30 , 2020 the OH Greenhouse project was awarded to Straight Line General Contractors. The new facilities will include two (2) green houses, one (1) headhouse and to accommodate program use requirements. Greenhouse Contractor to coordinate all scope regarding the greenhouse and surrounding areas with Complex Contractor. Complex Contractor will provide all sitework, fine grading, irrigation and planting surrounding the greenhouse at the completion of the greenhouse. Greenhouse Contractor to provide fully functional greenhouse including greenhouse structure and enclosure, foundations, slab and all utilities per the project documents. A graded, certified and surveyed building pad will be provided by the Complex Contractor. Greenhouse Contractor shall provide the excavation/ backfill of all foundations and utilities within the footprint of the greenhouse and to the various points of connection as illustrated on the Greenhouse Siteplan (Ref. Exhibit J). The Ornamental **As of June 29, 2020, the construction start date is approximately August 1st. Horticulture Complex Plans, Specifications and all approved Addenda (DSA #04-117182) have been provided in their entirety for the Greenhouse Contractor's use and coordination with the ongoing work around the Greenhouse site and these documents shall be incorporated into Greenhouse Contractors Bid as they apply to the work articulated in the Greenhouse Siteplan. The successful bidder will be required to furnish the District with a Performance Bond equal to 100% of the successful bid, and a Payment Bond equal to 100% of the successful bid, prior to execution of the Contract. Each bid shall be accompanied by the security referred to in the Contract Documents, the noncollusion affidavit, the list of proposed subcontractors, and all additional documentation required by the Instructions to Bidders. All questions and requests for information must be made in writing by mail or email to the attention of Brian Browning, Gafcon Modular Office, Cuyamaca College, 900 Rancho San Diego Parkway, El Cajon, CA 92019. Email: bbrowning@gafcon.com. For procedural questions, you may call Michele Costa at 619-660-4788. In order to assist the District in meeting its Disabled Veteran Business Enterprises ("DVBE") goal of at least three percent (3%) (as described in Paragraph 28 of 00100), bidders are encouraged (but not required) to seek out and include DVBE subcontractors and suppliers in their bid. When proceeding with good faith effort all DVBE documentation needs to be provided with bid submission refer to (Exhibit A). The DVBE advertisement period is 14 days prior to the bid opening scheduled for November 21, 2019, which is November 07, 2019. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. No bidder may withdraw his bid for a period of sixty (60) calendar days after the date set for the opening of bids.
Award
Educational
$1,937,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 18, 2020
August 1, 2020
900 Rancho San Diego Pkwy, El Cajon, CA
Related To This Project
El Cajon, CA
Bid Date: Feb 28 2019
El Cajon, CA
Bid Date: Jun 28 2022
El Cajon, CA
Bid Date: May 16 2023
El Cajon, CA
Bid Date: Aug 25 2022
El Cajon, CA
Bid Date: Aug 29 2022
El Cajon, CA
Bid Date: Aug 30 2022
El Cajon, CA
Bid Date: Aug 30 2022
El Cajon, CA
Bid Date: Sep 07 2022
El Cajon, CA
Bid Date: Aug 23 2021
El Cajon, CA
Bid Date: Jun 06 2022
El Cajon, CA
Bid Date: Jul 14 2022
El Cajon, CA
Bid Date: Jun 04 2015
El Cajon, CA
Bid Date: Jan 13 2023
El Cajon, CA
Bid Date: Oct 26 2020
El Cajon, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.