BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Seattle, Washington. Completed plans call civil work for a fire station.

A/E ESTIMATE: Base: $2,090,123; Alternate #1: $67,280; Alternate #2: $40,000 Locate two existing modular buildings at the existing North Precinct facility. The project, includes expansion of the existing secured parking area and miscellaneous tenant improvements inside the existing building and the relocated modular buildings. 2. Site demolition includes but is not limited to the removal of existing landscaping and paying as needed for the new parking area and to locate the modular buildings. Site demolition also includes work as needed to route subgrade utilities for the project, and to place new stormwater storage and treatment infrastructure. The scope includes removal of petroleum impacted soils as necessary. 3. Other sitework includes but is not limited to the placement of new utilities, pavement, security fence, lighting and landscaping. 4. The work includes the placement on the site of two modular buildings owned by the City of Seattle and currently stored in North Seattle. The work includes the transportation of these structures to the site, their placement and anchorage to new foundations, and work as required to complete the structure and weatherproof enclosure of one of the buildings, a "double wide" trailer, which is currently stored in two pieces. 5. The work will include the construction of bidder designed stairs, ramps and platforms to provide access to the entry doors of the modular buildings. 6. The work includes miscellaneous tenant improvements inside the existing building and the newly placed modular trailers. 7. The project includes several alternates, described in section 01 23 00 8. The base includes several unit price items as described in Section 01 22 00, 9. Sequence of construction: The work is to proceed in several distinct phases, with the understanding that the Owner will take occupancy of the phases of the work as they are completed. a. Phase 1: Mobilization, site preparation and construction, of the new parking lot extension at the southern portion of the site. This phase will include construction of new and modified security fencing around the entire secure perimeter of the site. SPD will take beneficial occupancy of the expanded parking lot before the contractor proceeds with the work of the next phase. b. Phase 2: Placement of the modular buildings, This phase will include all site preparation, grading, foundations, utility connections, bidder designed stairs ramps and walkways new paying and landscaping required to complete all work at the exterior of the existing building. This phase will also include all tenant improvements inside the newly placed modular buildings, making them complete for occupancy. SPD will take occupancy of this phase before the Contractor may proceed with the balance of the work. c. Phase 3; New Roll Call Room Tenant Improvements. This phase will include all work required to complete construction of the new roll call room, radio charging area and ITH room. in the southern portion of the building in the space formerly used as break room and bunk rooms. SPD will take occupancy of this phase before the Contractor may proceed with the balance of the work. d. Phase 4: New Evidence Processing Room and new Report Writing Stations. These spaces are to be built in the area formerly used for roll call. SPD will take occupancy of this phase before the Contractor may proceed with. the balance of the work. e. Phase 5: Remaining Tenant Improvements. This work will include the balance of the tenant improvements to the Report Writing areas, the locker 3700111.s and the interview rooms at the building lobby. 10. Owner provided IT and Security cabling, terminations and trim work will occur in coondination with Contractors electrical work. Contractor will be responsible to provide raceway as indicated on the documents and coordinate the schedule for the Owners contractors to maintain the orderly process of the Work. 11. The work includes bid alternates: a. Alternate 1: Mechanical chiller and boiler replacement as indicated on sheet M801, and as specified in Sections 23 52 16 and 23 64 23. b. Alternate 2: Electrical Vehicle Charging Infrastructure as indicated on sheet E A/E ESTIMATE: Base: $2,090,123; Alternate #1: $67,280; Alternate #2: $40,000 For purposes of the Inclusion Plan, this i.s considered a Facility type of project with a Past Performance of 25% WMBE utilization rates based on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel.beltran@seattle.gov or 200-684-4525. Back-up contact is Carmen Kucinski at Carmen@Kucinski@seattle.gov or 206-68.4-0188. All questions must be submitted in writing via email to the Project Manager, Andy Ishizaki, Andy.Ishizaki@seattle.gov before 5:00 p.m. on Wednesday, November 13, 2019 Bidders must understand the requirements of SMC 1.4.1.6. RCW 49.46 and demonstrate compliance prior to award.

Award

Fire / Police

$2,541,108.00

Public - City

New Construction, Site Work

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
86
Bidding Soon
2,313
All Active Projects
711
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 20, 2019

January 20, 2020

November 15, 2020

img_map_placeholder

10049 College Way N, Seattle, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.