BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Fort Bragg, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Replacement of 1100 linear feet of storm drain including several new drain inlets along the easternmost section of Maple Street, pavement rehabilitation of up to five alleyways and Maple Street, and replacement of several sections of sidewalk including new standardized ADA curb ramps. Work shall be completed within Fifty (50) Days from the date when Contract Time commences to run. The Engineer's Opinion of Probable Costs is approximately $1,373,924 or $1,478,010 when the alternate bid item is included. Reservation of Rights: City specifically reserves the right, in its sole discretion, to reject any or alt Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work, City may reject any and all Bids and waive any minor trregularities in the Bids. A California class A contractor's license is required to bid this contract. Joint ventures must secure a joint venture license prior to award of this Contract. City shall accept Bids only from Bidders that (along with all Subcontractors listed in Subcontractors List) are currently registered with the Department of Industrial Relations ("DIR") and qualified to perform public work pursuant to Labor Code Section 1725.5. Substitution of Securities: City will permit the successful bidder to substitute securities for any retention monies withheld to ensure performance of the contract, as set forth in Escrow Agreement for Security Deposits in Lieu of Retention and incorporated herein in full by this reference, in accordance with Public Contract Code Section 22300. This Project is subject to prevailing wage compliance monitoring and enforcement by the Department of Industrial Relations.

Award

Water / Sewer

$1,226,354.00

Public - City

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
2
Bidding Soon
70
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2021

May 18, 2021

img_map_placeholder

Multiple Locations, Fort Bragg, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.