Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 1, 2025 at 7:00 PM
Updated December 2, 2025
Site work, paving and new construction of a mixed-use development in Fontana, California. Working plans call for the construction of a 50,000-square-foot, three-story above grade laboratory facility; 51,000-square-foot, four-story above grade educational facility; 28,000-square-foot, three-story above grade educational facility; 8,000-square-foot, two-story above grade manufacturing facility; for site work for a educational facility; and for paving for a educational facility.
As of December 1, 2025, design is in progress. A design/build firm team has been selected. This project won't go out to bid until December, 2026. Plans include: - Welcome Center and Library: 51,000 GSF; 4 stories - Instructional Building 1: 28,000 GSF; 3 stories - Automotive Technology Building: 50,000 GSF; 2 and 3 stories - Operations & Maintenance Building: 8,000 GSF; 1-2 stories - Site and Infrastructure: drives, parking lots, utilities, green spaces, etc.
Pre-Construction/Negotiated
Educational
$173,000,000.00
Public - County
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 4, 2027
11070 Sierra Ave., Fontana, CA
Related To This Project
Fontana, CA
Bid Date: Sep 12 2024
Fontana, CA
Bid Date: Aug 30 2024
Fontana, CA
Bid Date: Sep 05 2024
Fontana, CA
Bid Date: Sep 19 2024
Fontana, CA
Bid Date: Sep 26 2024
Fontana, CA
Bid Date: Oct 07 2024
Fontana, CA
Bid Date: Oct 22 2024
Fontana, CA
Bid Date: Aug 14 2024
Fontana, CA
Bid Date: Aug 13 2024
Fontana, CA
Bid Date: Aug 15 2024
Fontana, CA
--
Fontana, CA
Bid Date: Aug 06 2024
Fontana, CA
Bid Date: Jul 31 2024
Fontana, CA
Bid Date: Jul 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
