BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 5, 2019 at 7:00 PM

Updated September 14, 2023

Site work and new construction of a mixed-use development in Huntington, West Virginia. Completed plans call for site work for a educational facility; for the construction of a 250,000-square-foot parking garage; and parking garage.

The Project consists of a new 4 level parking garage consisting of a precast concrete structure to be constructed on auger cast pile foundations. The new structure will be located within the block bounded by 15th Street, Charleston Avenue, and Columbia Avenue in the medical campus of Marshall University in Huntington, WV. The site is an existing surface parking lot. The parking garage is designed to accommodate approximately 700 cars. The approximate interior Project area of all floors is 250,000 square feet. Work includes site demolition, storm water detention and bioretention systems, utility relocation coordination, auger cast pile foundations, precast concrete structure (columns, beams, spandrels, litewalls, shear walls, double-tee floors, stair and elevator towers, stairs), elevators, plumbing, mechanical, electrical power and lighting. Bidding Documents; to reject any condition of the Bid by a Bidder that is in any way inconsistent with the requirements, terms and conditions of the Bidding Documents; or to reject a Bid that is in any way incomplete or irregular. Bids may not be modified or withdrawn for a period of sixty (60) days after receipt of Bids without forfeiture of Bid security, not as a penalty but as liquidated damages. The successful Bidder will be required to execute a Contract, provide a Performance Bond and a Labor and Material Payment Bond for 100% of the contract award, comply with all of the rules and regulations of the West Virginia Workers' Compensation Fund, and provide evidence of insurance coverage to the minimum limits required by the Contract Documents. The successful Bidder and all Subcontractors must pay the higher of the U.S. Department of Labor minimum wage rates or the West Virginia Department of Labor wage rates as established for Cabell County, pursuant to West Virginia Code 21-5-1 et. seq. Any work performed or any material contracted for prior to receipt of the Owner's written Notice to Proceed and/or Purchase Order shall be at the Bidder's risk. The Bidder, if successful and awarded a Contract, agrees that all Work is to be Substantially Complete by 7 January 2021 and agrees to achieve Final Completion by 28 January 2021.

Post-Bid

Parking Garage

$15,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2019

January 1, 2020

Project location map

15th St, Huntington, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.