BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Saint Paul, Minnesota. Completed plans call for the renovation of a museum; and municipal facility.

The state reserves the right to determine how it will respond to any instances of non-compliance or false certification of compliance. Potential state actions include, but are not limited to cancellation of the contract and/or suspending or debarring the contract vendor from state purchasing Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work. The prevailing wages in effect at the time of execution of the contract will be attached to that contract A. Provide all labor, materials, including accessories to completely clean all ductwork and HVAC equipment of all dirt, debris, fungus, bacteria, grease, and foreign materials that may have accumulated in and on the surfaces of systems. B. This includes all equipment and ductwork that remains after demolition. C. Refer to the drawings for the ductwork systems that are to be cleaned. Each Bid shall be accompanied by a Bid Bond in the form and amount no less than five percent (5%) of the total base bid. The Bidder pledges to enter into an Agreement with the Construction Manager on the terms stated in the Bid and will furnish such Bid Bond covering the faithful performance of the Contract and payment of all obligations arising thereunder Concurrently with execution of a Subcontract, or as requested by the Construction Manager at Risk, the Subcontractor shall furnish performance and payment bonds, each in an amount equal to one hundred percent (100%) of the subcontract price on the forms designated by the Construction Manager at Risk, provided by sureties acceptable to the Construction Manager at Risk. Cost of the bonds shall be included in the base bid price Questions due by 7-26/23

Award

Municipal

$6,271,000.00

Public - State/Provincial

Renovation

124

24

126

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
82
Bidding Soon
786
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2023

November 13, 2023

img_map_placeholder

1006 Summit Ave, Saint Paul, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.