BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2020 at 7:00 PM

Updated November 15, 2023

Renovation of a playground / park / athletic field in Guyton, Georgia. Completed plans call for the renovation of a playground / park / athletic field.

Effingham County Reserves the Right to Reject Any/and All Bids / Proposals and to Waive All Formalities. "effingham County is an Equal Opportunity Employer, M/f/h/v; All Proposers Are Required to Be Equal Opportunity Employers". SCOPE OF WORK: The work to be quoted consists of furnishing all materials, labor and equipment as shown below: (Effingham County will issue one contract for all work listed in this RFQ) SECTION 1: CONCRETE A. Batting Cages Size: (2) concrete areas - 15'x70' each cage (end to end) or 30' x 70" (side by side) Concrete: a. 4" slab of 3000 psi concrete b. 1" slope for every 10' toward each end of court c. Expansion Joints: use 0.5" (12mm) Saw Cut d. Rebar- 1/2 " steel rebar placed in both direction, tied, 24" center e. Surface finish = Heavy Broom f. Edge finish = Straight g. Concrete 1" above ground surface maximum h. Structure outside the pad - Sufficient Backfill Material must be prepared to support footings for court components i. CAGE Components are located inside the pad, anchors and or ground sleeves must be placed in the pad prior to pouring cement ALSO Frames layout in concrete before pouring B. Basketball court - Outdoor a. Concrete are -- Size 50' by 100' b. Concrete 1" above ground surface maximum c. 4" slab of 3000 psi concrete d. 1" slope for every 10' toward each end of court e. Expansion Joints: use 0.5" (12mm) Saw Cut f. Rebar- 1/2 " steel rebar placed in both direction, tied, 24" center g. Surface finish = Medium Broom h. Edge finish = Straight i. Structure outside the pad - Sufficient Backfill Material must be prepared to support footings for court components j. GOAL TO BE INSTALLED OUTSIDE OF COURT IN CONCRETE SECTION 2: OUTDOOR BASKETBALL COURT FINISH Basketball court - Outdoor - finishes with lines a. Court need to cure for at least 30 days b. Etch concrete with muriatic acid c. Then surface binder d. 2 coat of color coating e. Paint lines (EXACT SIZE TO BE DETERMINED PRIOR TO SECTION 2 WORK)

Award

Playgrounds / Parks / Athletic Fields

$128,500.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
62
Bidding Soon
634
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2020

February 17, 2020

Project location map

300 Stagecoach Ave, Guyton, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.