BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2024 at 8:00 PM

Updated July 14, 2024

Site work for a water / sewer project in Guyton, Georgia. Completed plans call for site work for a water / sewer project.

The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Sprayfield improvements including, but not limited to, installation of approximately 4,975 LF of 12" PVC, 985 LF of 8" PVC, 1,065 LF of 6" PVC, 1,450 LF of 4" PVC, 4,470 LF of 3" PVC, and 13,880 LF of 2" sewer forcemain and sprinklers. Forcemain installation method will be open cut installation. The project will also consist of sediment control and grassing. Time allotted for completion of work is one hundred twenty (120) calendar days. All Work shall be completed in accordance with the plans and specifications. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Owner reserves the right to reject any or all Bids and to waive informalities, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Contractor shall comply with E-Verify regulations. All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer

Bid Results

Water / Sewer

$453,335.00

Public - City

Site Work

1

9

31

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
48
Bidding Soon
631
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

August 12, 2024

Project location map

To Be Determined, Guyton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.