BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a bridge / tunnel in Suffield, Connecticut. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of 1/8/2019, The likely construction period would be March through December although firm dates have not yet been established. Replacement of Bridge No. 04819, Remington Street Over Stony Brookcontract Goal: 11% Disadvantaged Business Enterprises (Dbes)the Town of Suffield (Municipality) Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and That They Will Not Be Discriminated Against on the Grounds of Race, Color, National Origin, Sex, Sexual Orientation, Mental Retardation or Physical Disability, Including but Not Limited to Blindness, in Consideration for an Award."Bid Proposal Form", "Schedule of Prices", "Bid Bond", "Non-collusion Affidavit" and "bidder's Prequalification Approval Letter Signed by the Ctdot Contracts Manager Must Be Completed and Returned With the Submitted Bid. Failure to Properly Execute and Include Any One of These Five Documents in the Bid Submission Will Result in the Bid Not Being Read and the Subsequent Rejection of the Bid. For Those Bidders With Electronically Capabilities, the Project Can Be Viewed and Downloaded Electronically. A Hard Copy of the Bid Package Also Can Be Viewed at the Town Engineer's Office, 230c Mountain Road, Suffield, Ct 06078 (Tel. No. 860-668-3876).form 817 Standard Specifications and Supplemental Specifications May Be Obtained via the Connecticut Department of Transportation's Electronically. All Proposals Must Be on the Form Furnished by the Town of Suffield and Must Be Requested for the Above-named Project.note: Prospective Bidders Must Have a Current Sworn Statement (Con-16) on File With the Connecticut Department of Transportation and Be Prequalified to Perform Group No. 9 Intermediate Bridges Work. The Bidder's Prequalification Approval Letter Signed by the Ctdot Contracts Manager Shall Be Included as Part of the Bid Package Submitted to the Municipality.note: Any Contractor or Subcontractor Engaged in Surface Preparation and/or Coating Application Must Be Certified by the Steel Structures Painting Council. Note: a Surety Company Bond, on the Form Furnished by the Town, for at Least 30 Percent of the Amount of the Bid Must Accompany Each Proposal. A Certified Check Will Not Be Accepted. The Town Reserves the Right to Reject Any and All Bids. Note: the Apparent Low Bidder, as Determined by the Town of Suffield Immediately After the Bid Opening, Shall Submit the Pre-award Dbe Commitment Approval Request Form(S) to the Town of Suffield No Later Than Five (5) Calendar Days After the Bid Opening. This is a Requirement of Title 49, Code of Federal Regulations (Cfr) Part 26, Participation of Dbes.contractors That Find Discrepancies and/or Errors in or Between Plans, Specifications, Quantities and Other Matters, Must Immediately Notify the Town Engineer C/o Gerald J. Turbet, P.e., Town Engineer, 230c Mountain Road, Suffield, Connecticut 06078 or at Gturbet@suffieldct.gov in Writing Not Less Than Ten Days Before the Scheduled Bid Opening.

Award

Bridges / Tunnels

$3,823,820.00

Public - City

Paving, Renovation, Site Work

74

1

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
382
Active Projects
224
Bidding Soon
3,428
All Active Projects
1,441
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2019

March 23, 2020

img_map_placeholder

Remington St, Suffield, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.