BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2025 at 8:00 PM

Updated April 4, 2025

Site work for a bridge / tunnel in Suffield, Connecticut. Completed plans call for site work for a bridge / tunnel.

This project generally consists of the complete replacement of the existing bridge. The bridge includes a steel stringer and concrete deck superstructure supported on stone masonry abutment walls. The new structure is twin precast concrete box culverts with precast concrete wingwalls. The work also includes roadway reconstruction, placement of metal beam rail, bridge rail, associated regrading and turf restoration, riprap installation, temporary water handling, traffic control and other miscellaneous site work. The work described above includes furnishing, installing and incorporating all materials and equipment into the project as well as performing or providing all labor, supervision, equipment and services unless otherwise noted within the bid documents for the lump sum base bid. No Bidder may withdraw his bid for a period of sixty (60) days after the date of bid opening. A satisfactory Bid Bond in an amount equal to five (5%) of the base Bid, shall be submitted with each bid. The Bid Bond shall be made payable to the Town of Suffield and shall be properly executed by the Bidder and acceptable sureties. All bonds must be from sureties registered in the State of Connecticut. This contract is subject to State Contract Compliance requirements, including non-discrimination statutes and set-aside requirements. See CHRO Requirements in Contract Documents. The award of a Contract, if awarded, will be to a responsible and qualified bidder, provided that the bid is reasonable and that it is in the best interest of the Town of Suffield to accept such bid. The Town reserves the right to accept or reject any or all Bids, or waive any technicality in any Bid or part thereof, if deemed to be in the best interest of the Town of Suffield. 3157-031 Question Deadline 03/28/2025 Any request from a prospective Bidder for interpretation of meaning of Contract Drawings, Specifications or other Contract Documents shall be made in writing to Kim Fletcher, Managing Engineer, Barton and Loguidice LLC. To be given consideration, such requests must be received at least five (5) days prior to date fixed for opening of proposals. Such requests may be sent via e-mail to kfletcher@bartonandloguidice.com

Post-Bid

Bridges / Tunnels

$800,000.00

Public - City

Site Work

24

11

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
632
Active Projects
119
Bidding Soon
4,985
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 5, 2025

Project location map

Quarry Rd, Suffield, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.