Published March 18, 2025 at 8:00 PM
Updated April 4, 2025
Site work for a bridge / tunnel in Suffield, Connecticut. Completed plans call for site work for a bridge / tunnel.
This project generally consists of the complete replacement of the existing bridge. The bridge includes a steel stringer and concrete deck superstructure supported on stone masonry abutment walls. The new structure is twin precast concrete box culverts with precast concrete wingwalls. The work also includes roadway reconstruction, placement of metal beam rail, bridge rail, associated regrading and turf restoration, riprap installation, temporary water handling, traffic control and other miscellaneous site work. The work described above includes furnishing, installing and incorporating all materials and equipment into the project as well as performing or providing all labor, supervision, equipment and services unless otherwise noted within the bid documents for the lump sum base bid. No Bidder may withdraw his bid for a period of sixty (60) days after the date of bid opening. A satisfactory Bid Bond in an amount equal to five (5%) of the base Bid, shall be submitted with each bid. The Bid Bond shall be made payable to the Town of Suffield and shall be properly executed by the Bidder and acceptable sureties. All bonds must be from sureties registered in the State of Connecticut. This contract is subject to State Contract Compliance requirements, including non-discrimination statutes and set-aside requirements. See CHRO Requirements in Contract Documents. The award of a Contract, if awarded, will be to a responsible and qualified bidder, provided that the bid is reasonable and that it is in the best interest of the Town of Suffield to accept such bid. The Town reserves the right to accept or reject any or all Bids, or waive any technicality in any Bid or part thereof, if deemed to be in the best interest of the Town of Suffield. 3157-031 Question Deadline 03/28/2025 Any request from a prospective Bidder for interpretation of meaning of Contract Drawings, Specifications or other Contract Documents shall be made in writing to Kim Fletcher, Managing Engineer, Barton and Loguidice LLC. To be given consideration, such requests must be received at least five (5) days prior to date fixed for opening of proposals. Such requests may be sent via e-mail to kfletcher@bartonandloguidice.com
Post-Bid
Bridges / Tunnels
$800,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
May 5, 2025
Quarry Rd, Suffield, CT
Related To This Project
Suffield, CT
Bid Date: Mar 21 2019
Suffield, CT
Bid Date: Aug 22 2025
Suffield, CT
--
Suffield, CT
Bid Date: Dec 03 2024
Suffield, CT
--
Suffield, CT
Bid Date: Feb 15 2024
Suffield, CT
Bid Date: Feb 13 2019
Suffield, CT
Bid Date: Apr 02 2019
Suffield, CT
Bid Date: Oct 09 2020
Suffield, CT
Bid Date: Dec 19 2019
Suffield, CT
Bid Date: Oct 05 2023
Suffield, CT
--
Suffield, CT
--
Suffield, CT
Bid Date: Aug 24 2023
Suffield, CT
Bid Date: Jun 15 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.