BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cherry Hills Village, Colorado. Completed plans call for site work for a water / sewer project.

**As of January 28, 2020, this project has not yet been awarded. It is expected to be awarded in the next 30 days. The estimate for the project is $600,000 to $700,000. Question acceptance deadline 01/06/2020 06:00 PM EST Questions are submitted online Yes The scope of the project (WORK) includes all work necessary to furnish, install, test and provide a completed UV Cured CIPP rehabilitation, as well as repair and replace where indicated on construction documents. The project boundaries start at the intersection of East Quincy Avenue and South High Street and proceed approximately 5200 feet south and east until the boundary of the Cherry Hills Village Service Area North of Belleview Avenue (As Depicted in the Construction Documents). Work also includes the installation of 3 new manholes on the existing sewer interceptor. The interceptor is mostly 8-in diameter and 10-in Vitrified Clay Pipe (VCP) and is approximately 30 - 40 years old. It has experienced severe corrosion and deterioration. The UV Cured CIPP shall be designed with the liner being able to withstand all external loads including live loads, soil loads and hydrostatic (groundwater) pressure, which is assumed to be 1-ft below the ground surface to the invert of the existing pipe for each specific installation location. General Requirements - Insurance Required - Bid Bond 10 % - Performance Bond 100 %

Bid Results

Water / Sewer

$983,981.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
38
Bidding Soon
994
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2020

February 17, 2020

img_map_placeholder

Cherrymoor Dr, Cherry Hills Village, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.