BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 26, 2021 at 8:00 PM

Updated July 11, 2025

Renovation of a detention facility in Oshkosh, Wisconsin. Completed plans call for the renovation of a detention facility.

NOTICE: Effective January 1, 2014, all potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected.Contractor certification applications and instructions for completing the form may be obtained from the DOA Website DFD Contractor Certification page: https://doa.wi.gov/Pages/DoingBusiness/ContractorCertification.aspx or upon request from DFD-- email dfdcertification@wisconsin.gov. This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of the replacement of deteriorated underground drain lines; upgrade MEP's including equipment and building ventilation and exhaust systems; select replacement of exhaust hoods and associated fire suppression systems; and select kitchen equipment replacement. This project will require both off and normal hours work to keep the kitchen operational throughout construction Bidder shall identify the division of work they are bidding on when requesting Bidding Documents online. Base Bids will be received as a single lump sum bid for: 2) Fire Protection ( Fire Suppression); 3) Plumbing; 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements

Under Construction

Jails / Prisons

$1,508,714.00

Public - State/Provincial

Renovation

64

25

21

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
135
Bidding Soon
1,112
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2021

July 20, 2021

Project location map

1730 W Snell Rd, Oshkosh, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.