Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2021 at 8:00 PM

Updated November 14, 2023

Renovation of an educational facility in Oshkosh, Wisconsin. Working plans call for the renovation of a educational facility.

**As of July 30, 2021, the project will Rebid. In general the work consists of: Installation of new chemical mixing and distribution system for the boiler heating system in the Central Heating Plant.

Final Planning

Educational

$80,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
79
Bidding Soon
1,749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2021

August 30, 2021

Project location map

800 Algoma Blvd, Oshkosh, WI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed