Renovation of an educational facility in Platteville, Wisconsin. Completed plans call for the renovation of a educational facility.

In general, the work consists of: demolition of an existing chiller and cooling tower in Markee Pioneer Student Center. Installation of one new 900-ton centrifugal chiller in the existing Markee Pioneer Student Center mechanical room. The existing cooling tower support structure will be modified as necessary for the installation of the new cooling tower. All necessary piping, pumps, valves, controls, motors, and electrical wiring will be replaced to serve the new chiller. New piping will include new condenser water risers from the mechanical room on the first floor to the roof. A new concrete areawell and new openings in the foundation wall into the mechanical room are to be added at the east side of the Markee Pioneer Student Center to facilitate a path for chiller installation / replacement. New direct buried chilled water piping will be extended from the existing mechanical room to existing direct buried chilled water piping headers outside of the Student Center. Direct buried piping will also be extended from the existing direct buried piping mains to Ottensman Hall. New chilled water piping will be installed in Ottensman Hall from the point of entry from the new direct buried piping to connect to existing piping such that Ottensman Hall cooling will be served by the campus chilled water system. Demolition of existing equipment and piping within Ottensman Hall consists of only what is necessary for connections of new piping. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. Bid Opening - Bidders may also join the Microsoft Teams meeting via Microsoft Teams: https://teams.microsoft.com/l/meetup-join/19%3ameeting_NmIxOWU2MzEtODJkNi00ZDFiLThiOTYtYTZiMjM0MzNjZDU5%40thread.v2/0context=%7b%22Tid%22%3a%22f4e2d11c-fae4-453b-b6c0-2964663779aa%22%2c%22Oid%22%3a%2216987bcd-db9d-4075-aa58-5b60d229f4e3%22%7d Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Bid Results

Educational

$4,076,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
24
Bidding Soon
592
All Active Projects
265
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2024

October 7, 2024

img_map_placeholder

1 University Plaza, Platteville, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.