BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Hinton, Alberta. Completed plans call for the renovation of a municipal facility.

Work Covered By Contract Documents 1 The main works are included in this Contract as follow: 1 Replace the air handling system with a new air handling unit. 2 Replace two (2) existing boilers with two (2) new condensing boilers. 3 The existing controls system will be replaced. 4 Replace the existing chiller and fluid cooler with a new condensing unit. 5 Replace all the existing VAV's with new digital VAV boxes. 6 Remediate hazardous materials. Work of this Contract is comprised of Phase 1, and at the discretion of the Province Phase 2: Phase 1 includes the following: 1 Remove existing air delivery system to the Courthouse including fans, preheat coil, cooling coil, ductwork, dampers, and sensors. Install a new Package Air Handling Unit (AHU), which shall be pad-mounted and installed outdoors. Install a new supply and return air ductwork to building air systems. Selective ductwork demolition and replacement required. Install new duct insulation. 2 Remove the existing chiller, pumps, and associated piping and insulation. This system will be replaced with a new condensing unit (packaged with new AHU) for the ventilation/cooling system. 3 Replace existing glycol preheat coil pump, heat exchanger, preheat heating water pump, and associated piping and insulation. Install with new pumps and heat exchanger for new AHU. Insulate new piping. 4 Replace all terminal boxes, zone control valves (for finned radiation and force flow) and all associated thermostats within the courthouse. 5 Remove existing pneumatic controls system and provide a new digital controls system complete with operator workstation. The new BMS system will be provided with new hardware and software and will be able to monitor/control the ventilation, heating, and cooling systems as well as the VAV and room temperatures in the building. 6 The Facility was built in 1977 and has asbestos based piping insulation. This was confirmed by an Asbestos Report retained by Alberta Infrastructure and will be made available upon request. All Asbestos Abatement must be completed according to specific and regulated Government Guidelines. Contractor shall use an abatement company that is certified, licensed, insured and competent to remove and dispose of asbestos material. 7 Phase 1 shall be completed and invoiced by May 31, 2020. Phase 2, if commenced, will include the following: 1 Replace existing boilers, heating circulation pumps, valves, insulation, flue vents and accessories in the Mechanical Room with a new Condensing Boiler System in order to have a fully operational boiler plant to suit the building heating systems requirements. Modify existing power wiring and controls wiring to suit the new boilers installation. Relocate existing domestic hot water heater and install new flue vent. Repair and make good the existing chimney penetration. 2 Boilers to interface with the new ECMS programming and graphics to operate the units as per boiler plants sequence of operation. 3 Modify existing natural gas piping to suite the new boilers installation and new domestic hot water heater location. 4 The Facility was built in 1977 and has asbestos based piping insulation. This was confirmed by an Asbestos Report retained by Alberta Infrastructure and will be made available upon request. All Asbestos Abatement must be completed according to specific and regulated Government Guidelines. Contractor shall use an abatement company that is certified, licensed, insured and competent to remove and dispose of asbestos material. 5 Phase 2, if notice is provided, shall be completed by December 31st, 2020.

Award

Municipal

$499,400.00

Public - State/Provincial

Renovation

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
1
Bidding Soon
27
All Active Projects
10
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 28, 2020

March 2, 2020

December 31, 2020

img_map_placeholder

237 W Jasper St, Hinton, AB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.