Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a mixed-use development in Berkeley, California. Completed plans call for the renovation of a laboratory facility; and for site work for a water / sewer project.
The University of California, Lawrence Berkeley National Laboratory is requesting qualifications for Design-build services for the design and construction of the Linear Assets Modernization Project. This is a two-phase, best-value source selection process. Phase I is the Request for Qualifications. The outcome of Phase I will be an identified "short-list" of no more than three respondents. This Phase I is not an offer to enter into a subcontract but merely a solicitation of qualifications from those interested in participating in this solicitation process. Phase II is the Request for Proposal, where the short-listed respondents will be invited to submit competitive proposals. At the conclusion of the Phase II, a stipend of $150,000 will be provided to the unsuccessful offeror(s), in accordance with the requirements set forth in the solicitation documents. Scope Overview Electric utilities are the most significant replacement and upgrade. LAMP will also include replacement and improvements along shared utility corridors for natural gas, compressed air, water, IT, and sanitary sewage, as indicated in Figure 1. SP1: Increase power capacity at the existing main electrical substation ("Grizzly Substation") from 38 megawatts ("MW") to 70 MW and provide a total of 50 MW of power to Building-59 for National Energy Research Scientific Computing Center ("NERSC") from the Grizzly Substation. Perform utility upgrades in the Lawrence Corridor as shown in Figure 1 - Utility Corridor Map below. (See Figure 2 below) SP2: Develop new utility corridors along East Canyon and McMillan Road to modernize the infrastructure utilities throughout the Lab. (See Figure 3 below.) Question Deadline 01/25/2024 at 5:00 PM PT Scope of Work The scope of LAMP includes design and construction services to increase the reliability, capability, and safety of LBNL's utility infrastructure. The project intends to increase LBNL's campus-wide electrical capacity at the Grizzly Substation, modernize the electrical distribution, including additional power to NERSC, install an electrical supervisory control and data acquisition ("SCADA") system, and segregate electrical 12- kilovolt line 1 and line 2 currently in common manholes within utility corridors. Infrastructure improvements will be prioritized based on the needs of the Lab. Utility systems that could be upgraded, listed in alphabetical order, include: A. Communication/Information Technology B. Compressed air C. Controls D. Domestic water E. Electric medium voltage distribution F. Electrical campus substation G. Landside abatement/hydrauger H. Natural gas I. Sanitary sewer J. SCADA (electrical with future microgrid features) K. Storm drainage MBE (26%), WBE (7%)
Post-Bid
Laboratories
$450,300.00
Public - Federal
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 14, 2024
March 14, 2024
To Be Determined, Berkeley, CA
Related To This Project
Berkeley, CA
Bid Date: Jan 24 2019
Berkeley, CA
Bid Date: Oct 26 2023
Berkeley, CA
Bid Date: Nov 16 2023
Berkeley Marina Roadway Improvements Project on University Ave/ Marina blvd/ Spinnaker Way - 4254805
Berkeley, CA
Bid Date: Mar 11 2021
Berkeley, CA
Bid Date: Nov 13 2023
Berkeley, CA
Bid Date: Nov 21 2023
Berkeley, CA
--
Berkeley, CA
--
Berkeley, CA
Bid Date: May 16 2024
Berkeley, CA
Bid Date: Oct 26 2023
Berkeley, CA
Bid Date: Nov 03 2023
Berkeley, CA
Bid Date: Oct 20 2023
Berkeley, CA
Bid Date: Oct 20 2023
Berkeley, CA
Bid Date: Oct 20 2023
Berkeley, CA
Bid Date: Oct 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.