BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Berkeley, California. Completed plans call for site work for a water / sewer project.

The work of this contract is divided into two bid packages, “Bid Package A” and “Bid Package B”, briefly summarized as follows: Retaining Wall and Storm Drain Improvement – “Bid Package A” (Spec No. 23-11616-C Re-Issued) The work done under this component includes but is not limited to: traffic control; potholing; protection of underground utilities; survey monument and utility cover adjustments; tree removals; stump grinding; removal and replacement of retaining wall asphalt pavement, concrete pavement, sidewalk, and curb & gutter; retaining wall crack sealing; storm drain maintenance hole removal and replacement; removal and replacement of metal fence; removal and replacement of guardrails; pavement marker placement; roadway sign installation; and concrete path repairs. The work under this component is described in the bid documents, including but not limited to: Plans, titled FY 2023 Retaining Wall and Storm Drain Improvement Project, Specification No. 23-11616-C (Re-Issued). Technical Specifications, with associated bid items indicated with the prefix “A”. Intersection Work at Woolsey Street & Eton Avenue – “Bid Package B” (Spec No. 23-11614-C Re-Issued) The work done under this component includes but is not limited to: sawcutting and removing existing asphalt concrete pavement, Portland cement concrete pavement, and associated base materials; utility cover and manhole adjustments for communications, sanitary sewer, storm drain, and domestic water utilities; removal of existing trees, stumps, and roots; new Portland cement concrete sidewalks, curb, gutter, curb ramps, roadway medians, and traffic circle; new asphalt concrete pavement sections, including a raised crosswalk; pavement markings; and signage. The work under this component is described in the bid documents, including but not limited to: Plans, titled Pedestrian Improvements at Intersection of Woolsey Street and Eton Avenue, Specification No. 23-11614-C (Re-Issued). Technical Specifications, with associated bid items indicated with the prefix “B”. California Contractor License Classification required: A General Engineering

Post-Bid

Water / Sewer

$1,900,000.00

Public - City

Site Work

33

11

12

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
90
Bidding Soon
1,839
All Active Projects
776
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

July 16, 2024

img_map_placeholder

Multiple Locations, Berkeley, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.