Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a civil project in Lake Country, British Columbia. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; water / sewer project; and for paving for a road / highway.
Comprehensive corridor improvement works in Lake Country, BC along Bottom Wood Lake Rd (Main St to McCarthy Rd) and Konschuh Rd. The scope of work for this project has 4 primary components and can be generally summarised as follows: 1. Utility, Road, and Intersection Improvements: Full-length Watermain replacement, including fused HDPE beneath Middle Vernon Creek; Full-length Storm Sewer main construction, including installation of dry-wells; Full-depth road reconstruction; Construction of a new Roundabout. 2. Streetlighting and Underground Electrical: Installation and Commissioning of new Street Lights, including bases, conduit, poles, wire, etc.; Installation of ducting, vaults, junction boxes, etc. for undergrounding of BC Hydro, Telus, and Shaw overhead; Coordination with BC Hydro, Telus, Shaw, and Fortis BC during pole removal and commissioning of underground systems by others. 3. Culvert Replacement: Isolation and bypass of Middle Vernon Creek, including coordination with Environmental Monitor; Construction of CIP concrete footings and headwalls, including footing excavation and site dewatering; Construction of a new multi-plate arch culvert, including supply and coordination with manufacturer representative; Removal of existing corrugated steel culvert; Backfill and channel construction; 4. Landscape Restoration and Improvements: Creek bed and channel restoration; Habitat restoration replanting; Additional aesthetic landscaping works; Minor Irrigation system relocation and improvements. TIMELINE: Construction is underway.
Under Construction
Roads / Highways
$3,700,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 22, 2020
March 24, 2020
Bottom Wood Lake Rd, Lake Country, BC
Related To This Project
Lake Country, BC
Bid Date: Jun 22 2022
Lake Country, BC
--
Lake Country, BC
Bid Date: Mar 07 2023
Lake Country, BC
Bid Date: Apr 28 2022
Lake Country, BC
--
Lake Country, BC
--
Lake Country, BC
--
Lake Country, BC
Bid Date: Feb 10 2022
Lake Country, BC
--
Lake Country, BC
Bid Date: Apr 19 2022
Lake Country, BC
Bid Date: Apr 21 2022
Lake Country, BC
Bid Date: Dec 12 2022
Lake Country, BC
--
Lake Country, BC
Bid Date: Mar 24 2023
Lake Country, BC
Bid Date: Jan 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.