BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2021 at 8:00 PM

Updated June 8, 2024

Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.

Per the owner, as of February 23, 2021, WW-645R is currently in the process of being awarded. WW-685R was awarded to Western Water Constructors, Inc. by the Commission on January 26, 2021. WW-685R is expected to begin construction in May 2021. Closed solicitation has been included below for reference. ............. The San Francisco Public Utilities Commission ("SFPUC") is issuing this Request for Qualifications ("RFQ") in search of candidates with the qualifications specified in this RFQ to be qualified to respond to the forthcoming request for bids to construct and perform general engineering work to selected wastewater pump stations; including the Westside Pump Station Reliability Improvements and/or North Shore Pump Station Wet Weather Improvements ("Project" or "Projects"). Candidates responding to this RFQ do so with the understanding that the SFPUC does not guarantee the award of any contract or work as a result of qualification. SFPUC is proposing the WW-645R Westside Pump Station Reliability Improvements contract to improve reliability of the pump station by providing back-up electrical power, back-up and/or replacement mechanical equipment and ventilation improvements. The Westside Pump Station, located at the southeast corner of Sloat Boulevard and the Great Highway, receives dry weather (DW) and wet weather (WW) flow from the western side of San Francisco by means of several transport / storage structures via gravity. The flow is then screened and pumped to the Oceanside Water Pollution Control Plant (OSP) for treatment or the flow is decanted, screened and pumped to the Southeast Ocean Outfall (SWOO) during the wet weather season. The method of contractor selection has not been determined at this time. WW-645R:$50-$55 / WW-685R: $28M-$32M

Under Construction

Water / Sewer

$87,000,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
11
Bidding Soon
1,701
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2021

Project location map

To Be Determined, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.