BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Kenosha, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project includes 19,400 SY of removing concrete pavement, 7,950 CY of common excavation, 8,280 Tons of base aggregate dense 1 1/4 -Inch, 9,300 Ton of breaker run, 16,420 SY of new concrete pavement 8-Inch, removing and replacing 6,610 LF of curb and gutter, removing and replacing 960 SY of concrete driveway, removing and replacing 13,900 SF of 4-Inch sidewalk, 2,910 SF of 6-Inch sidewalk, removing existing street light poles, arms & fixtures and replace with 31 new poles, arms & LED fixtures, installing 3,365 LF of schedule 40 2-Inch conduit, 660 LF of schedule 40 3-Inch conduit, 17 new pull boxes, removing and replacing 2,130 LF of storm sewer, installing 47 new inlets, removing and replacing 5 manholes, 8-Inch water main cut and cap, new water services & lead service replacements, 57 long side services and 43 short side services, 3,140 SY of top soil and sod, removing and replacing existing signage, construction staking, maintaining traffic control and any other incidental items necessary to complete said work. The form provided for "Bidder's Proof of Responsibility" shall be completed and returned to the Director of Engineering not less than five (5) days before the date of bid opening. Prequalification required - yes A sworn Prequalification Statement must be submitted to City Engineer as a condition of bidding. No bid will be received from any prospective bidder who has not submitted the statement. City reserves the right to require additional information from bidder to determine whether bidder is competent and reliable.

Award

Roads / Highways

$3,899,300.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
123
Bidding Soon
1,914
All Active Projects
807
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2020

March 9, 2020

img_map_placeholder

22nd Ave, Kenosha, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.