Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation and addition to a mixed-use development in Kirkwood, Missouri. Completed plans call for the renovation of a educational facility; and for the addition of a educational facility.
April 2021 Proposition R Bond Passed As of March 28, 2023, the work on HVAC improvements were completed. Work on ADA accessible ramps at North Glendale and Robinson Elementary Schools are underway. Under construction at Kirkwood High School, North Kirkwood Middle, Nipher Middle, Westchester Elementary and Tillman Elementary Further information regarding design and construction timelines has not been released. o Plans for Tillman Elementary, 230 Quan Ave., include the addition of a multipurpose gym, a three-story eight-classroom and library addition, an outdoor learning environment created in an existing courtyard space, and a drive connecting the front parking area to the rear to streamline drop-off and pick-up procedures. An expanded art suite will include a kiln room. o The site plan for Westchester Elementary, 1416 Woodgate Drive, includes a major expansion housing eight classrooms and a new library, an outdoor learning area, a cafeteria expansion, and an art and music expansion with a kiln. Additional classrooms will be created through the repurposing of existing space. o The Student and Staff Services building, located behind Nipher Middle School at 700 S. Kirkwood Road, will see a reconfiguration of space on both the administrative and warehouse sides to streamline operations. Two additions will create separate spaces for operations, materials storage and shop class spaces. o Keysor Elementary, 725 N. Geyer Road, will be getting security upgrades. A secure vestibule added to the right side of the building will require visitors to submit to a background check before being buzzed in. The gymnasium will see door hardware changes to keep it isolated during after-hour rentals. o North Glendale Elementary, 765 N. Sappington Road, will also add a security vestibule at the main entrance. o Plans for Robinson Elementary School, 803 Couch Ave., include modernizing an existing elevator, additional and upgraded restrooms, and hardware changes to isolate the gym during rental times. o Kirkwood Early Child Center, 100 Sappington Road, is anticipating the addition of a walkway around the building and overhangs at each of the exterior doors to give parents a safe, covered space as they enter. An additional security vestibule, created from repurposed front office space, would serve as a visitor entrance. o At Nipher Middle School, 700 S. Kirkwood Road, a three-story addition on the east side would include a new music room and practice space, as well as two additional classrooms and one renovated classroom. o North Kirkwood Middle School, 11287 Manchester Road, is anticipating small additions that connect hallways to create looped corridors. The current administrative suite would be converted to classrooms and the track would be resurfaced. o Kirkwood High School, 801 W. Essex Ave., is expecting a new welcome center and 15 additional classrooms, some from new construction and some from renovation. An outdoor connector currently between the building's two wings would become an enclosed indoor space. A new secure access entrance would be included on the Essex Side of the building. LED lighting upgrades, energy improvements, accessibility, egress improvements and ADA compliance are anticipated across the district. d. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Under Construction
Educational
$61,262,600.00
Public - City
Addition, Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2023
Multiple Locations, Kirkwood, MO
Related To This Project
Kirkwood, MO
Bid Date: Apr 05 2023
Kirkwood, MO
Bid Date: Apr 18 2023
Kirkwood, MO
Bid Date: Feb 21 2019
Kirkwood, MO
Bid Date: Apr 28 2023
Kirkwood, MO
Bid Date: May 04 2023
Kirkwood, MO
Bid Date: May 14 2023
Kirkwood, MO
Bid Date: Apr 06 2023
Kirkwood, MO
Bid Date: Mar 28 2023
Kirkwood, MO
Bid Date: Mar 24 2023
Kirkwood, MO
Bid Date: Mar 06 2023
Kirkwood, MO
Bid Date: Feb 24 2023
Kirkwood, MO
Bid Date: Feb 20 2023
Kirkwood, MO
Bid Date: Feb 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.