Site work and paving for a road / highway in Madison, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of October 28, 2020, an engineer has been selected and this project is mid way through the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to late 2022. *The closed solicitation has been included below for reference: Replace two intersections with an interchange. A frontage road will eliminate traffic exiting onto USH 12 from Mill Pond Road. Three roundabouts are being considered at ramp and frontage road connections. Approximately 30% of design has already been completed. Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. I The contract price will be based on the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Anticipated Construction Cost :$17,000,000-$19,999,99 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Do not include any information that meets the definition of "trade secret" as that term is defined in s. 134.90(1)(c), Wis. Stats. Questions are provided below. At least eight (8) business days before the interview, short-listed firms will be provided specific interview time and location. Interview Date02/04/2020 Solicitation No. SW-01 Highway USH 12 Project Limits Cth Ab Overpass County Dane The method of contractor selection has not been determined at this time. WISDOT - RFQ Engineering - Modernization

Design

Roads / Highways

$20,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
208
Bidding Soon
1,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2021

Project location map

US-12, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.