Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a municipal facility in Springfield, Illinois. Design plans call for the construction of a municipal facility; and for site work for a municipal facility.
As of February 2021, this will be a design-build project, so the architect will be evaluating sites, preparing bridging documents and preparing an RFP to allow the State to solicit design-build proposals. It will likely be 18 months at least before the RFP is ready. The previous solicitation is listed below for reference. --- Appropriated Amount: $8,050,000 Estimated Total Project Cost: $80,500,000 Professional Liability Insurance Required: $100,000 The scope of work includes preparing program statement/scope development package followed by the bridging documents for the Design-Build project. Elements of the project will include the construction of a Tier III Central Computer Facility to be located in the Springfield area. A minimum of LEED Silver Certification will be required. Design Considerations: Evaluate transition of existing building and data equipment for potential reuse at the new facility. Evaluate available property, including state-owned property and propose a site. Give consideration to the application of renewable energy sources, including but not limited to, the use of solar energy. Site Development: The bridging documents will include, but are not limited to: - Project Intent - Preliminary Site Plan - Program Elements - Conceptual Designs - Required Infrastructure Expansion or Modification - Preliminary Specifications to Establish Basis of Design The A/E will develop a comprehensive bridging document, including all of the mentioned elements, in addition to all other miscellaneous criteria as required to provide clearly defined design guidance as a precursor for the follow-on Design-Build contract. The bridging documents will be developed in accordance with CDB's Guidelines for Bridging Documents (available for download on the CDB Reference Library) as appropriate to the project's specific scope of work. The successful firm will need to demonstrate their experience and expertise with similar building type and use. The A/E will need to determine if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate. A combined MBE/WBE goal of 18 percent is applicable to the A/E team. A VBE goal of 3 percent is applicable to the A/E team. The interviews for this project are tentatively scheduled for March 31, 2020. The method of contractor selection has not been determined at this time *This project timeline has been extended due to the public health crisis.
Design
Municipal
$80,500,000.00
Public - State/Provincial
LEED Certification, New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2022
To Be Determined, Springfield, IL
Related To This Project
Springfield, IL
Bid Date: May 03 2022
Springfield, IL
Bid Date: Jun 30 2022
Springfield, IL
Bid Date: Jun 03 2022
Springfield, IL
Bid Date: Jul 06 2022
Springfield, IL
Bid Date: Jul 06 2022
Springfield, IL
Bid Date: Jul 12 2022
Springfield, IL
Bid Date: Jul 12 2022
Springfield, IL
--
Springfield, IL
Bid Date: Jun 28 2022
Springfield, IL
Bid Date: Oct 31 2023
Springfield, IL
Bid Date: Jun 27 2022
Springfield, IL
Bid Date: Jun 22 2022
Springfield, IL
Bid Date: Jun 24 2022
Springfield, IL
Bid Date: Jun 24 2022
Springfield, IL
Bid Date: Jun 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.