EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2024 at 8:00 PM

Updated April 10, 2024

Site work and paving for a road / highway in Stillwater, Minnesota. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of April 9, 2024, a design team has been identified. Final design to be completed Winter 2023 with construction bidding in early 2024. The Washington County Public Works Department is issuing this request for proposals (RFP) to provide project coordination, permitting approvals, final engineering services, drainage design, utility coordination, construction documents, and post design services for the CSAH 3 Corridor Improvement Project. CSAH 3 from CSAH 7 to CSAH 4 • Is approximately 3.7 miles • Is a two-lane rural undivided highway with spot locations of bituminous curb • Is functionally classified as an A Major Collector • Has traffic volumes of 960 vehicles per day (2018) • Has a 50 mph and 45 mph posted speed limit with multiple advisory speed curves • Is located entirely within May Township The method of contractor selection has not been determined at this time.

Final Planning

Roads / Highways

$4,000,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Planting
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
74
Bidding Soon
1,054
All Active Projects
383
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.