EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2020 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Everett, Pennsylvania. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of April 20, 2020, the advertisement for this contract has been cancelled. No time frame for re-advertising has been established. This project provides for slope repairs along the Turnpike roadway shoulders. Work includes drainage improvements, guiderail replacement, single face barrier installation, rock armor installation, and maintenance and protection of traffic. Work items include, but are not limited to: 14,442 CY Excavation, Various Types 5,190 SY Geotextile, Class 4, Type A 2,600 SY Geogrid, Class 1, Type A 12,372 TON Superpave Asphalt Mixture, HMA Courses, Various Mixes 7,797 TON Subbase (No. 2A) 3,401 TON Subbase under Guide Rail 12,996 SY Milling of Bituminous Pavement Surface, 2" Depth 5,549 LF Pavement Base Drain with Slope Drainage, Type II 22,556 LF Remove Existing Guide Rail 20,662.5 LF Type 31-S Guide Rail 6,358 LF Single Face Concrete Barrier, 52" 34,440 LF Temporary Concrete Barrier and Temporary Impact Attenuator 4,291 SY Shoulder Backup 7,360 SY Mulching-Bonded Fiber Matrix 2,299.5 LF Rock Armor 24,699 CY Rock Armor, Modified 7,442 LF Compost Filter Sock, 12" Diameter 2,556 LF Compost Filter Sock, 18" Diameter 22,817 LF Compost Filter Sock, 24" Diameter 26,244 LF 6" Waterborne Pavement Markings Milepost 146.05 is located 0.55 mile east of the Bedford Interchange, Exit 146, and Milepost 159.64 is located 1.85 miles west of the Breezewood Interchange, Exit 161, both in Bedford County, Pennsylvania. The proposal and plans are published electronically in EBS and are available to registered business partners for downloading and printing. An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.) A Prequalification Certification and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. The opening and listing of bids not meeting all the terms and conditions of the bid advertisement or bid procedures does not act as a waiver or modification of any requirements contained in the bid advertisement or bid procedure. The Provisions of the Pennsylvania Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, together with the rates and regulations promulgated by the Secretary of Labor and Industry applicable thereto, shall apply to this contract. Any questions for this project must be submitted electronically in EBS by registered business partners.

Final Planning

Roads / Highways

$11,732,513.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Electric Domestic Water Heaters, Residential, Collector-to-Tank, Solar-Electric Domestic Water Heaters, Residential, Collector-to-Tank, Heat-Exchanger-Coil, Solar-Electric Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Central Heating Equipment, Solar Energy Heating Equipment
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Embankments, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 42 - Process Heating, Cooling, and Drying Equipment

Division 42 - Process Heating, Cooling, and Drying Equipment

Process Heating Equipment, Process Heaters, Solar Process Heaters, Industrial Heat Exchangers and Recuperators, Industrial Solar Radiation Heat Exchangers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
58
Bidding Soon
1,029
All Active Projects
477
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2020

October 20, 2020

img_map_placeholder

Multiple Locations, Everett, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Slope Repairs and Remediation Between Milepost 146.05 and Milepost 159.64

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.