Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Sonoma, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
** As of January 18, 2023 , this project has not yet been awarded. A timeline or award has not yet been established.** The Work consists of seismic retrofit of secondary clarifiers at Owner's treatment plant, located at 22675 8th Street East, in the City of Sonoma, California. The Work includes, but is not limited to replacing the existing internal secondary clarifier mechanisms in their entirety and modifying the reinforced concrete foundations, with the new system designed to withstand governing seismic and hydrodynamic sloshing loads. Work shall be completed within 670 Days from the date when Contract Time commences to run. Trades include, but are not limited to; demo, concrete, metal fabrications, joint sealants, industrial coatings, electrical, earthwork, process interconnections, pipes and pipe fittings, PVC pipe, and circular clarifier equipment. DVBE/MBE/WBE/SBE participation is encouraged Amount $2,920,000 to $3,820,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidders may arrange to obtain full-size Drawings from Digital Prints & Imaging, 375 Tesconi Circle, Santa Rosa, California, 95401, 707-546-0401, for an additional charge to be paid directly to Digital Prints & Imaging. For information pertaining to the Bidding Documents, please contact Owner at (707) 547-1900. The full-size Drawings may not represent addenda. Project Description: The Work consists of seismic retrofit of secondary clarifiers at Owner's treatment plant, located at 22675 8th Street East, in the City of Sonoma, California. The Work includes, but is not limited to replacing the existing internal secondary clarifier mechanisms in their entirety and modifying the reinforced concrete foundations, with the new system designed to withstand governing seismic and hydrodynamic sloshing loads. Work shall be completed within 670 Days from the date when Contract Time commences to run. Bidding Documents contain the full description of the Work
Bid Results
Water / Sewer
$5,563,740.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 6, 2022
February 6, 2023
22675 8th St E, Sonoma, CA
Related To This Project
Sonoma, CA
--
Sonoma, CA
--
Sonoma, CA
--
Sonoma, CA
--
Sonoma, CA
--
Sonoma, CA
--
Sonoma, CA
--
Sonoma, CA
Bid Date: Nov 03 2022
Sonoma, CA
Bid Date: Nov 16 2022
Sonoma, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.